This project involved the modification and hook-up of the Wells Uquo W9NE to Line B, including rerouting activities at Location 10 in Nsik Eket, Akwa Ibom State.
The operation was designed to enhance production flow and improve network efficiency within the pipeline system.
Project Scope
Integration of W9NE well into existing Line B infrastructure.
Rerouting of pipeline segments to align with updated production layouts.
Execution of tie-in operations and associated construction work.
Testing and commissioning of the rerouted sections.
Project Highlight Outcome
The project achieved seamless integration of the W9NE well, reinforcing the flow network and boosting operational reliability. The rerouted infrastructure now supports improved throughput while aligning with field development objectives.
- 28 and 36 Inches Valve change out
- AL HOSN Pipeline Pigging
- Hot tap installation
- Leak repair intervention on a 36” Independent Gas transmission system (GTS 1)
- Pre commissioning of 24 inch by 121-kilometer pipeline
- Integrity assessment 24'' obiafu-ubeta Pipeline
- GRE Piping Installation
- KP 27 Emergency Pipeline Repairs
- SNG Leak Test
- Auxillary routine pigging and pumping on 18
- Cleaning, Gauging, and Intelligent Pigging of 10” x 18.5km Oredo to Ogharefe Crude Export Pipeline