PIPELINE COMMISSIONING SERVICES

At Topline Limited, we employ exceptional engineers and utilize the best equipment in pipeline services.  We deploy integrated services to enhance onshore and offshore pipeline performance.

We tailor exacting solutions to meet client requirements in the following areas:

  • Pipeline Commissioning
  • Pipeline Pre-Commissioning
  • Pipeline De-Commissioning.
  • Pipeline Flooding/ Auxiliary Pumping
  • Hydro Testing
  • De-watering

 

Topline’s pipeline pre-commissioning services give your pipeline the best possible start in service and help reduce future corrosion, improve efficiency, maximize throughput and prevent hydrates from forming.

We can validate the line integrity by hydro testing to a variety of pipeline codes, allowing you to meet regulatory requirements.

Thorough cleaning may mitigate against long term corrosion and we offer a range of solutions to clean the pipeline, depending on the specification.

For natural gas and petrochemical pipelines, thorough drying or conditioning is essential to prevent the formation of hydrates and deliver the product purity you need. We reduce drying time and move the line into production as quickly as possible using air, vacuum, nitrogen, or chemical swabbing. A final purge with nitrogen minimizes explosion risk. 

In addition, our pipeline commissioning services focus on helping you to get quality product into your pipeline safely, quickly, and efficiently – enabling faster start up.

Topline has the experience and proven systems to help you cost-effectively decommission assets in ways which are both safe and environmentally responsible.

Pipelines can be flushed and cleaned via chemical and/or mechanical methods for in-situ abandonment or where required, mothballed for future use as we parade some of the best engineers and equipment in pipeline services. 


OUR SERVICES

PORT HARCOURT OFFICE

40 Birabi Street, GRA Phase 1, P.O Box 7847, Port Harcourt,
Rivers State.
+234 84 462 638,
+234 908 781 0140
inquiries@toplinelimited.com

WARRI OFFICE

Plot 4-8 Topline Street, Off DSC Expressway (Opposite Total Filling Station) Otokutu (Near Warri),
Delta State.
+234 53 321 480,
+234 807 401 1720

ABU DHABI

Liberty tower, 4th floor, Sheik Khalifa Street, P.O Box 7615, Abu Dhabi.
+971 2 627 2737
Fax: +971 2 627 0048

AFFILIATES

  • wqc
  • BINDT
  • Bureau Veritas
  • british-safety-council
  • ohsas
  • sspc
  • NACE-logo
  • SON-Logo2
  • PPSA
    "...Paving the way in the Pipeline and Process Engineering industry, using top notch equipment and capable engineers to achieve desired results".

    © 2019 Topline Limited. All Rights Reserved.